Your kitchen is the hardest-working room in your home. It is where family meals come together, guests gather, and daily life happens. In Dubai, where villas and apartments range from compact studios to sprawling Palm Jumeirah homes, a kitchen renovation can transform not just how you cook, but how your whole home feels — and what it is worth.
But one question stops most homeowners before they start: how much does a kitchen renovation in Dubai actually cost?
The honest answer is that it depends. A simple refresh can start from AED 15,000, while a full luxury villa kitchen can pass AED 150,000. The gap comes down to size, materials, appliances, layout changes, and whether plumbing or electrical points need to move.
This guide breaks down real kitchen renovation costs in Dubai for 2026, explains what drives the price up or down, walks you through the process step by step, and shows you how to choose a renovation team you can trust. Whether you live in a Dubai Marina apartment or a villa in Arabian Ranches, you will finish this guide knowing what your project should cost — and how to keep it on budget.
How Much Does a Kitchen Renovation Cost in Dubai?
Most Dubai homeowners spend between AED 25,000 and AED 80,000 on a full kitchen renovation. Here is a realistic breakdown by scope:
Budget Refresh: AED 15,000 – AED 30,000
A refresh keeps the existing layout and focuses on surfaces. It typically includes repainting or wrapping cabinets, replacing the countertop with a budget quartz or granite, a new sink and tap, updated handles, and fresh tiling or a backsplash. This is ideal for rental apartments or homeowners preparing a property for sale.
Mid-Range Renovation: AED 30,000 – AED 70,000
This is the most common bracket. It covers semi-custom or modular cabinets, quartz or solid-surface countertops, a new sink and hob, under-cabinet lighting, a tiled backsplash, and mid-range appliances. Most apartment kitchens and smaller villa kitchens fall in this range.
Premium Renovation: AED 70,000 – AED 150,000+
Premium projects use fully custom joinery, stone or porcelain countertops, integrated Siemens, Bosch or Miele appliances, a kitchen island, smart storage systems, and designer lighting. Large villa kitchens with structural changes sit at the top of this range.
Cost per Square Metre
As a rough rule, budget AED 2,000 to AED 4,500 per square metre for a mid-range renovation, and AED 5,000 or more per square metre for premium work. A compact 10 sqm apartment kitchen therefore lands around AED 25,000 to AED 45,000, while a 25 sqm villa kitchen can run AED 70,000 to AED 120,000.

What Drives the Cost Up or Down?
1. Cabinets and Joinery
Cabinets are usually the single biggest line item, accounting for 30 to 40 percent of the total. Flat-pack or ready-made modular cabinets are the cheapest option. Semi-custom cabinets, cut to fit your space, cost more but use the space far better. Fully bespoke joinery in marine plywood or solid wood is the premium choice and lasts longest in Dubai’s humidity.
2. Countertops
Laminate is the budget choice at roughly AED 400 to AED 800 per linear metre installed. Quartz is the most popular mid-range option at AED 1,200 to AED 2,500 per linear metre, prized for its durability and low maintenance. Granite sits in a similar band, while porcelain slabs and natural marble push higher and need more careful sealing in a busy kitchen.
3. Appliances
Keeping your existing appliances saves thousands. A new built-in oven, hob, hood, fridge and dishwasher package from a mid-range brand typically adds AED 12,000 to AED 30,000. Premium European brands can double that figure, so decide early whether appliances are in or out of scope.
4. Layout Changes
Moving the sink, hob or gas point means rerouting plumbing and electrical work, and sometimes Dubai Municipality or building approvals. Keeping the classic work triangle — sink, hob, fridge — in place is the simplest way to control cost. Open-plan changes, such as removing a wall between kitchen and living room, add structural and approval costs but can transform the space.
5. Flooring and Tiling
Porcelain tiles are the Dubai standard: durable, easy to clean, and well suited to the climate. Expect AED 120 to AED 300 per square metre supplied and installed for good quality tiles. Waterproof vinyl or large-format porcelain slabs cost more but create a seamless, high-end look.
6. Labour and Project Management
Skilled labour in Dubai is not the cheapest line item, and it should not be. Poor installation is the most common cause of cabinets that sag, doors that do not close, and countertops that crack. A reputable company includes project management, protection of the rest of your home, and a snagging visit in its price.
Kitchen Renovation Costs: Villas vs Apartments
Apartments
Apartment kitchens are smaller, which keeps material costs down, but they come with their own rules. Most buildings require a renovation permit, approved working hours (usually 9am to 5pm, Sunday to Thursday), and a refundable deposit. Service lifts must be booked for material delivery, and noisy work is restricted. Budget an extra AED 1,000 to AED 3,000 for permits, deposits and building requirements. If your building is managed by a developer such as Emaar or Dubai Properties, check their fit-out guidelines before signing a contract.
Villas
Villa kitchens are larger and offer more freedom — islands, breakfast bars, outdoor connections, and pantry rooms all become possible. The trade-off is scale: more cabinetry, longer countertops, and often a full re-tile. Villas in communities such as Arabian Ranches, Jumeirah Village Circle (JVC), and Dubai Hills may require community approval for external changes, though internal kitchen work rarely needs it. If your renovation touches gas lines, structural walls, or drainage, Dubai Municipality approvals apply. The Dubai Municipality portal publishes fit-out and building permit guidance for residential work, and your contractor should handle submissions on your behalf.

The Kitchen Renovation Process, Step by Step
Step 1: Site Visit and Measurement
A good renovation starts with a detailed site survey. The team measures the space, checks wall levels, notes plumbing and electrical points, and discusses how you actually use the kitchen. Bring photos of kitchens you like and a list of frustrations with your current layout.
Step 2: Design and 3D Visuals
You should receive a layout plan and 3D renders before any work begins. This is where you confirm cabinet heights, island size, appliance positions, and lighting. Changes on paper are free; changes after installation are expensive.
Step 3: Quotation and Contract
A proper quotation is itemised: cabinets, countertops, appliances, tiling, plumbing, electrical, and labour listed separately. Be wary of a single lump-sum figure with no breakdown. The contract should state the timeline, payment milestones, warranty, and what happens if hidden problems — such as water damage behind old cabinets — are found.
Step 4: Demolition and Preparation
Old cabinets, countertops and tiles come out, and the space is stripped back. This is dusty work, so a good team seals off the kitchen from the rest of the home and protects your floors.
Step 5: Plumbing, Electrical and Tiling
Plumbing and electrical points are moved or added first, followed by wall and floor tiling. In Dubai’s climate, waterproofing matters: a proper waterproof membrane under wet-area tiling prevents leaks into the unit below, a common and costly problem in apartments.
Step 6: Cabinet Installation and Countertops
Cabinets are installed and levelled, then countertops are templated, cut, and fitted. Stone countertops need a templating visit after cabinets are in, so allow a few extra days in the schedule.
Step 7: Appliances, Finishing and Snagging
Appliances are connected, handles and lighting fitted, and sealant applied. A final snagging walk-through lists anything that needs adjusting — door alignment, paint touch-ups, sealant lines. Do not make the final payment until snagging is complete.
Typical Timeline
A refresh takes 1 to 2 weeks. A mid-range full renovation takes 3 to 5 weeks. A premium villa kitchen with custom joinery can take 6 to 8 weeks, including approvals and stone templating. Add a week of buffer for material deliveries, which can slip during summer or holiday periods.
Materials That Work in Dubai’s Climate
Dubai’s heat and humidity punish poor materials. Kitchens face steam, high temperatures, and — in villas — occasional dust ingress. Choose accordingly:
- Cabinet carcasses: Marine plywood or high-density MDF with a moisture-resistant finish. Avoid untreated chipboard near sinks and dishwashers.
- Door finishes: Acrylic and lacquered finishes wipe clean and resist humidity better than raw wood veneer. Handleless push-to-open doors suit modern apartments.
- Countertops: Quartz is the safest all-rounder — non-porous, heat resistant, and stain resistant. Granite is beautiful but needs periodic sealing.
- Backsplash: Large-format porcelain or glass is easier to clean than small mosaic tiles with many grout lines.
- Sinks and taps: Stainless steel or granite composite sinks last longest. Choose taps with ceramic cartridges, which cope better with Dubai’s hard water than cheaper washer types.
Hard water is worth planning for. Dubai’s desalinated supply leaves limescale on taps and inside appliances. A water softener or scale filter, fitted during renovation, protects your new kitchen and your appliances for years.
Kitchen Styles Popular in Dubai
Modern Handleless
Flat-front cabinets, integrated appliances, and a neutral palette. The most popular style in Dubai Marina, Downtown, and JVC apartments. It photographs beautifully and suits open-plan living.
Classic Shaker
Framed cabinet doors, warm neutrals, and brass or brushed-gold hardware. Popular in villas in Arabian Ranches and Jumeirah, where a warmer, family feel suits the space.
Industrial-Luxe
Dark cabinetry, stone countertops, open shelving, and black hardware. Works well in loft-style apartments and larger villas with high ceilings.
Open-Plan Kitchen-Living
Removing the wall between kitchen and living area is the single most transformative change in Dubai apartments. It adds light, space, and social connection — but confirm with your building whether the wall is structural before committing.
How to Choose a Kitchen Renovation Company in Dubai
This decision matters more than any single material choice. Look for:
- 1. A Dubai trade licence and insurance. Ask to see both. Unlicensed teams are cheaper until something goes wrong.
- 2. A portfolio of completed Dubai projects. Visit one if possible, or at least request photos and a reference you can call.
- 3. An itemised written quotation. No breakdown, no deal.
- 4. A clear warranty. Cabinets and workmanship should carry at least a one-year warranty; reputable firms offer more on joinery.
- 5. In-house teams, not day labour. Companies with their own carpenters, plumbers, and electricians deliver more consistent quality.
- 6. Realistic timelines. A company promising a full villa kitchen in one week is cutting corners somewhere.
Be cautious of quotes far below the market. They usually hide thin materials, unskilled labour, or a long list of “extras” that appear mid-project. The cheapest quote is rarely the cheapest renovation.
If you are renovating a bathroom at the same time, planning both rooms together saves on labour and disruption. Our guide to bathroom renovation costs in Dubai (https://dmbrandsdubai.com/bathroom-renovation-dubai-cost/) explains how combined projects are priced.
Finishing Touches That Elevate the Result
Small details separate a good kitchen from a great one. Under-cabinet LED strips make worktops usable at night and cost little during renovation. A false ceiling with recessed spotlights hides ducting and wiring while giving the kitchen a clean, finished look — see our guide to false ceiling installation in Dubai (https://dmbrandsdubai.com/false-ceiling-installation-dubai/) for options and costs. If your kitchen opens to the entrance, a video intercom lets you answer the door without leaving the cooking — details are in our intercom installation Dubai (https://dmbrandsdubai.com/intercom-installation-dubai/) guide.
Stone countertops deserve proper care from day one. Natural stone should be sealed after installation and re-sealed periodically, and professional polishing restores the finish if it dulls. Our marble polishing Dubai (https://dmbrandsdubai.com/marble-polishing-dubai/) guide explains the process and costs.
Other touches worth budgeting for: soft-close hinges on every door, pull-out corner units that end dead space, a boiling-water tap, and a dedicated appliance garage that keeps the countertop clear.
Mistakes to Avoid
1. Starting without a fixed design. Changing the layout mid-project wastes materials and time. Sign off the design and 3D renders first.
2. Choosing style over storage. Open shelving looks great in photos but collects dust and grease in a working Dubai kitchen. Balance display space with closed storage.
3. Ignoring ventilation. A powerful, externally ducted hood matters more in Dubai than almost anywhere else. Recirculating hoods simply move cooking smells around an air-conditioned home.
4. Under-budgeting by 10 percent. Always hold a contingency of 10 to 15 percent for hidden issues — water damage, uneven walls, or outdated wiring found during demolition.
5. Skipping building approval. In apartments, unapproved work can lead to fines and forced removal. Get the permit first; it usually takes a few days.
6. Buying appliances before measuring. Appliance dimensions vary by brand. Confirm the exact model and its cut-out size before cabinetry is manufactured.
7. Forgetting lighting layers. One ceiling light is not enough. Combine task lighting over worktops, ambient ceiling lights, and accent lighting inside glass cabinets.
Kitchen Layouts Explained: Which Shape Suits Your Home?
The layout you choose shapes everything else — cost, storage, workflow, and how the room feels. Dubai homes commonly use five layouts, and each has a different price profile.
The L-shaped kitchen runs along two adjoining walls and is the most common layout in Dubai apartments. It leaves the rest of the room open, works well for open-plan living, and keeps costs moderate because plumbing stays on one or two walls. It suits kitchens from 8 to 20 square metres.
The U-shaped kitchen wraps three walls and maximises storage and worktop space. It is ideal for larger apartments and villas where the kitchen is a dedicated room. Costs rise with the extra cabinetry, but the storage payoff is enormous, especially for families that cook daily.
The galley kitchen uses two parallel runs with a corridor between them. Common in older Dubai apartments and studios, it is efficient and affordable, but needs careful planning so two people can work without colliding. A minimum corridor width of 120 cm keeps it comfortable.
The island kitchen adds a freestanding island to an L or U shape. Islands need space — at least 90 cm of clearance on all sides — so they suit villas and large apartments. An island adds AED 8,000 to AED 25,000 depending on size, stone, and whether it includes a hob, sink, or seating. It is the single most requested feature in Dubai villa renovations, and for good reason: it creates a social hub and adds serious resale appeal.
The peninsula kitchen is a connected island, attached to a wall or run at one end. It gives most of the island’s benefits in less space and at lower cost, making it a smart compromise for mid-sized apartments.
Whichever layout you choose, respect the work triangle: the sink, hob, and fridge should form a triangle with each leg between 120 cm and 270 cm. A triangle that is too tight feels cramped; one that is too stretched wastes steps. Your designer should show the triangle on the plan before you approve it.
Appliance Selection: What to Buy and What to Skip
Appliances can quietly consume a third of your renovation budget, so choose deliberately. Start with what you actually use. A family that cooks daily needs a powerful hob and a large oven; a household that eats out most nights does not.
Hobs: Gas hobs remain popular in Dubai villas, but induction hobs are gaining fast — they are faster, safer, and easier to clean, and they suit apartments where gas connections are limited. Budget AED 1,500 to AED 5,000 for a good hob.
Ovens: A built-in single oven costs AED 2,000 to AED 6,000; a double oven or steam oven runs higher. If you bake rarely, a quality single oven plus a microwave combi covers most needs.
Hoods: Do not under-spec the hood. Dubai kitchens need extraction of at least 600 m³/h for a standard hob, ducted outside wherever the building allows. Budget AED 1,500 to AED 5,000.
Refrigeration: Integrated fridge-freezers look seamless but cost more and offer less capacity than freestanding models. Decide based on family size, not looks alone.
Dishwashers: A full-size integrated dishwasher (AED 2,000 to AED 5,000) is one of the best quality-of-life upgrades in any renovation. If space is tight, slimline 45 cm models exist.
Small appliances: Plan dedicated storage for the air fryer, blender, and coffee machine, or they will colonise your worktop. An appliance garage — a cabinet with a lift-up door and internal power points — keeps them accessible but hidden.
Buy appliances early in the process and give the exact model numbers to your joiner. Cabinetry is cut to the appliance, not the other way around, and a late swap can mean remaking a cabinet.
Renovation Permits and Building Rules in Detail
Dubai’s permit landscape confuses many homeowners, so here is the practical picture. For internal kitchen work in a villa, you generally need no authority approval unless you alter structure, drainage, or gas lines. Your community may still require a simple notification or a refundable deposit for contractor access.
In apartments, the building management is the authority that matters most. Typical requirements include a completed renovation application, contractor trade licence and insurance copies, a refundable deposit (often AED 2,000 to AED 5,000), and adherence to permitted working hours. Some buildings require a post-completion inspection before returning the deposit, so keep the site tidy and protect common areas during material deliveries.
If your project moves a gas point, your contractor must use a Dubai Municipality-approved gas contractor, and the work needs inspection. Never let an unapproved worker touch gas lines — the safety and legal risks are severe.
For structural changes, such as removing a load-bearing wall for open-plan living, a licensed engineer must confirm the design and Dubai Municipality approval is required. Your renovation company should manage this process, including drawings and submissions. Budget extra time — approvals can add two to four weeks — and never start structural work before approval is granted.
Budgeting Tips That Actually Work
Get three itemised quotes. Compare them line by line, not just on the total. One quote may exclude tiling or appliances that another includes.
Fix the scope in writing. Every change after work starts costs more than the same change before. A written scope with a change-order process protects both sides.
Phase the work if needed. If the full dream kitchen is beyond this year’s budget, do the structural and cabinetry work now and upgrade appliances later. Cabinets are hard to retrofit; appliances are easy to swap.
Buy materials with lead times early. Stone countertops, custom cabinetry, and imported appliances can take weeks. Order them as soon as the design is signed off.
Keep a 10 to 15 percent contingency. Hidden water damage, uneven walls, and outdated wiring are discovered during demolition, not before. A contingency fund means these surprises delay nothing.
Kitchen Renovation Checklist: From First Idea to Final Handover
Use this checklist to keep your project organised and avoid the oversights that cause delays.
Before you contact contractors:
- Measure your kitchen and photograph every wall, including plumbing and electrical points.
- List what frustrates you about the current kitchen and what you want to change.
- Collect inspiration photos and note the styles and colours you like.
- Set a realistic budget range and a contingency of 10 to 15 percent.
- Check your building’s renovation rules, permit requirements, and working hours.
When comparing contractors:
- Confirm trade licence, insurance, and at least three recent Dubai references.
- Request itemised quotations with materials, brands, and labour separated.
- Ask for a written timeline with milestones and a snagging process.
- Confirm warranty terms for cabinetry, workmanship, and appliances.
Before work starts:
- Sign off the final design and 3D renders in writing.
- Confirm appliance models and dimensions with the joiner.
- Agree payment milestones tied to completed stages, not calendar dates.
- Protect floors and furniture in adjacent rooms, and agree dust-control measures.
- Notify neighbours and building management of the start date and working hours.
During the project:
- Visit the site at least weekly and photograph progress.
- Raise concerns immediately — a crooked cabinet is easy to fix before the countertop goes on, and difficult after.
- Keep all change requests in writing with agreed costs.
At handover:
- Walk through every door, drawer, hinge, light, and appliance with the contractor.
- Test taps, drainage, and electrical points.
- List every snag in writing and agree a completion date before making the final payment.
- Collect warranty documents, appliance manuals, and care instructions for stone and cabinetry.
A contractor who welcomes this level of organisation is a contractor worth hiring. One who resists written scopes and staged payments is a warning sign.
Frequently Asked Questions
How much does a kitchen renovation cost in Dubai in 2026?
Most full renovations cost AED 25,000 to AED 80,000. Budget refreshes start around AED 15,000, while premium villa kitchens can exceed AED 150,000. The final figure depends on size, materials, appliances, and layout changes.
How long does a kitchen renovation take in Dubai?
A refresh takes 1 to 2 weeks, a mid-range renovation 3 to 5 weeks, and a premium villa kitchen 6 to 8 weeks. Add buffer time for material deliveries and stone templating.
Do I need approval to renovate my kitchen in Dubai?
For internal work in a villa, usually not, unless you move gas lines or structural walls. In an apartment, your building management almost always requires a renovation permit and sets working hours. Dubai Municipality approval is needed for structural or drainage changes.
What is the cheapest way to renovate a kitchen in Dubai?
Keep the existing layout, wrap or repaint cabinets instead of replacing them, choose laminate or budget quartz countertops, and keep your current appliances. A refresh like this can cost AED 15,000 to AED 30,000.
Is quartz or granite better for a Dubai kitchen?
Quartz is the safer all-rounder: non-porous, stain resistant, and needs no sealing. Granite is natural and beautiful but needs periodic sealing and can stain. Both cope well with Dubai’s heat.
Should I remove the wall between my kitchen and living room?
If the wall is not structural and your building approves, open-plan conversion is one of the highest-impact changes you can make. It adds light and space, but confirm structural status and budget for electrical and finishing work on both sides.
How much does a modular kitchen cost in Dubai?
A modular kitchen for a standard apartment typically costs AED 20,000 to AED 50,000 including cabinets, countertops, and installation, before appliances. Larger villa modular kitchens run AED 50,000 to AED 100,000+.
Does a kitchen renovation increase property value in Dubai?
Yes. A modern, well-finished kitchen is one of the strongest selling points in Dubai’s property market, particularly for apartments in Marina, Downtown, and JVC, where buyers compare many similar units. Expect strong returns on mid-range renovations; ultra-luxury finishes rarely return their full cost.
Can I live in my home during a kitchen renovation?
Yes, but expect dust, noise, and no working kitchen for several weeks. Most families set up a temporary kitchenette with a kettle, microwave, and mini-fridge, and eat out more than usual. Good contractors seal off the work area to limit disruption.
What warranty should a kitchen renovation include?
Cabinetry and workmanship should carry at least a one-year warranty, with longer cover on joinery from reputable firms. Appliances carry manufacturer warranties. Get all warranty terms in writing before work starts.
How do I handle Dubai’s hard water in a new kitchen?
Fit a scale filter or water softener during renovation, choose taps with ceramic cartridges, and wipe stone surfaces dry. This protects finishes and appliances from limescale build-up.
When is the best time to renovate a kitchen in Dubai?
Work can happen year-round, but many homeowners schedule renovations in summer while travelling, or in the cooler months when material deliveries are more reliable. Avoid starting just before Ramadan or major holidays if your building restricts noisy work.
Should I choose an island or a peninsula kitchen?
An island suits large kitchens with at least 90 cm clearance on all sides and adds the most social and resale value. A peninsula gives similar benefits in less space and at lower cost, making it the smarter choice for mid-sized apartments.
Can I renovate my kitchen in stages?
Yes. Do cabinetry, layout, and services first, since those are hard to change later. Appliances, lighting upgrades, and accessories can follow when budget allows.
What is the work triangle, and why does it matter?
The work triangle connects the sink, hob, and fridge. Each leg should measure 120 to 270 cm. A well-planned triangle cuts wasted steps and makes cooking more comfortable every day.
How do I budget for a kitchen renovation in Dubai?
Set your bracket first — refresh, mid-range, or premium — then get three itemised quotes and hold back 10 to 15 percent as contingency. Fix the design and appliance models before work starts to avoid costly mid-project changes.
Is it better to renovate in summer or winter in Dubai?
Both work. Summer suits homeowners who travel and can vacate the home, while cooler months offer more reliable material deliveries. Avoid starting just before major holidays if your building restricts noisy work.
Conclusion
A kitchen renovation in Dubai is one of the best investments you can make in your home — if it is planned properly. Know your budget bracket, keep the layout where possible, choose materials that survive Dubai’s climate, and work with a licensed team that gives you an itemised quote and a written warranty.
Start with a site visit and a realistic quotation, and do not rush the design stage. The kitchen you plan carefully on paper is the kitchen you will love using every day.
Ready to get started? Contact DM Brands Dubai for a free site visit and an itemised kitchen renovation quotation — licensed, insured, and proudly serving Dubai homes.